Wednesday, November 10, 2010

Porch and Garage


A lot of work is being done this week, not only the garage but the work has been started on the front porch and stairs. Here the hole is being dug for the footings.


The hole is dug and is ready for the footings to be poured. Somehow I didn't get a photo of the poured footing but it can be seen in other photos.


Blocks are being added as a base for the platform and stairs.


After building the block frame, it is filled with crushed stone.


Work continues on the garage. The beams are all on the roof.


The side wall is almost done also. Tomorrow, sheeting should be on and will be ready to shingle.