Tuesday, June 1, 2010
Waste Plumbing and Upstairs Wiring
I stopped by the house today and the plumber has been busy. He put all the waste pipes in below the first floor. This is the main line that goes to the septic system.
Plumbing for the shower/tub on the first floor.
Inside the tub.
The electrician was also there, these are the wires that are being sent up to the attic waiting for the upstairs to be finished sometime in the future.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment