Tuesday, February 22, 2011
Upstairs is Started
The second floor, phase three, has been started. The garage still needs work but our carpenter was able to start framing the upstairs rooms.
This will be the master bedroom. The door on the right is the door into the bedroom and the one on the left will be going from the bedroom into the bathroom.
This is the stairs going down to the first floor. What we are going to do is make the stairway ceiling about eight feet high and make a four feet high storage area on top of that; the ceiling is twelve foot high upstairs.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment