Wednesday, June 9, 2010

Plumbing and Start of Outside Trim

Things have been extreamly slow the last week, little to none has been done. But, yesterday things started happening. Tony started trimming out the windows, see below, and the plumbing will be complete today.


This is the configuration that we are going to use around the windows. In between the boards will be a plywood that can be exposed to the weather.


This is the tubing that is being used for the water pipes. A nice feature is the red for hot and blue for cold.


Some tubing that is in the first floor ceiling.


The hookup for the tub and shower.


Hookup for the washer.


Ice maker hookup, this is important because my wife is a iced tea addict.

Saturday, May 22, 2010

Plumbing

I'm finally back, I spent some more time in the hospital, better now. Also, our contractor has been busy doing some other work the last two weeks so not much carpentry work is getting done. The wiring is almost done and the plumber had been busy last week.




The plumber stubbed in some piping upstairs so we will not have to tear out any walls or ceilings when we finish the upstairs sometime in the future.


The hookup for the washer and dryer in the half bath/laundry downstairs.


This is the bathroom connected onto the bedroom downstairs. This will be our bedroom suite until we complete the upstairs we will then move our bedroom upstairs and this will become the guest room.


Holes drilled in the joists to run the water tubing. We are going with flexible tubing, I believe it is PEX.