Saturday, February 27, 2010

Adding Sub Floor to Floor Repair


After Tony(the carpenter) fixed the floor joists he added the sub flooring you see here; this is in the back of the building.



In the front of the building the floor is just missing. This photo shows what is below the floor, just a crawl space. Remember, this was a church, not a house. The white pipe on the right goes to the septic tank, this will be hooked up in the future.


This photo was taken after the joists were replaced (sorry I did not have my camera when that was being done(note to self:always take your camera)). And if you are wondering how the septic will be hooked up with the floor being installed, Tony left off a piece of sub flooring(not in photo) and will make a trap door for access.

An additional note, the joists you see above are going to be removed as well as the studs to the left. We are going to leave the beam and enough of the studs to safely hold it up or we may add posts to do that. The beam will be for decoration and will not hold any load. This area will be part of our Greatroom.

Saturday, February 20, 2010

Work has Begun

Work has finally begun, the first thing being done is the floor in the back of the building has to be repaired. At first, our carpenter Tony, thought we would be able to jack up the floor and just replace the beam. The floor was sagging under the weight of wood that was stacked on it and a cast iron stove. Also, some of the back wall is being framed out.


When he went under the floor he saw that the beams had all cracked in that area and the floor had to be torn up and replaced. We did not count on having to replace this part of the floor. The floor is 3-1/4 " x 3/4" vertical grain Douglas Fir. We are trying to decide what to replace the floor with. Douglas Fir is more expensive than oak and not as durable. We have some decisions to be made; I will let you know what we decide.


This is one of the beams from under the floor. As you can see, it has some rot and is broken.

Monday, February 1, 2010

The Well

This was the well before we bought the house. It is just a hand dug well, I'm guessing it is about 10 feet deep. It was covered by a piece of plywood and set into the foundation.



Here is a photo of the inside of the well.



Before we bought the house we decided to have a well drilled, we figured that we would rather spend a few thousand to determine if we could get potable water than buy a house and find out that we could not get water. The land is small and with the septic being in the front(the well must be 75 feet way)we only had one small spot to drill.


You can see here the process of drilling. The red house next door had to drill 500 feet to get enough water, we hoped for better. It turns out we had to drill 300 feet and got 2 gallons per minute. That was enough for our needs and meets code. The water fills up about 280 feet of the shaft(about 400 gallons) so we have that much to use before we have to rely on the 2 gallons per minute.


The new well before we have to pump hooked up.

Sunday, January 17, 2010

Bats

You might have been wondering about the tarp on the ceiling. No it is not to protect the floor from water, the roof is new, it is to catch guano(bat poop). Yes, we have a bat problem. I am hoping that the bats flew south for the winter, just kidding. Bats hibernate in the winter and I hope they went with some of their friends to a cave to hang out, but I doubt it. Hopefully the building will be buttoned up by the time they awaken and we can put in bat tubes, devises that allow the bats to leave but not come back.



Close-up of guano(bat poop).

Wednesday, January 13, 2010

It's Official

We are now the proud owners of this "diamond in the rough".


This is the view from the right side, the building on the left is the old firehouse that was converted to a house by the previous owner of my house.



The view looking to the left, down the road.



This photo shows the fire escape that is going to be removed. It was put there when the building was a Grange Hall.

Sunday, January 10, 2010

Some Inside - Before Photos

Here are some "Before" photos. This first one is toward the front of the building.


When the previous owner gutted the building he stacked all the floor boards from the second floor as well as the beams in nice neat piles. Hopefully, this will cut down on costs since we can reuse much of them.


This photo is toward the back of the building, which shows the tarp wall. This is the first thing to replace!


Tomorrow we close on the property. Work will start in a few weeks but don't worry, there are other photos to be posted.

Saturday, January 9, 2010

Genesis

Colebrook, CT - My wife and I decided to take on a new project, but this time we will not be doing most of the work. My wife saw this building in the Realestate.com and thought it would be a cool place to live. We did our "due diligence" and decided that would be in our budget to get this in livable condition. We always wanted some place with an open floor plan and this fit the bill. Also, it is across the street from a river, another thing we wanted.


The building is 49'x 33' and two and a half stories high. In the real estate listing, it said that it had a full basement(just a crawl space), and needed a few finishing touches(it is gutted). I read another listing that said it had two bedrooms and a bathroom...it is just a shell! One more thing that was not communicated, the back wall is just a tarp. Anyway, we are not the kind of people that would quibble over a few small details and went ahead and bought it; closing in a few days.



Some history as I know it so far. It was originally built as a church in 1800, in 1938 it was converted to a grange hall. Somewhere along the line the church windows were removed and smaller ones were put in to replace them and a second story was added inside. As I find out more I will communicate the information here.


I hope everyone will follow along on our new adventure and wish us luck. I will try to document every step along the way and hopefully we will end up with one cool house...and hopefully in budget! We are not ones to do too much planning and we are kind of winging it on the final look. We had plans drawn up for the structural part of the house but the finishing touches are not finalized.

Comments are welcome, let me know what you think. Tomorrow photos of the inside.