Wednesday, June 16, 2010
Small Things
We were away for four days and a lot of small details were done in that time. This is not so small but most of the trim was added around the windows, more to come. Also, the area where the door and fire escape were, was patched with clapboards.
The area at the tops of the corner columns was added with a simple overlapped board. It is fitting with the trim that is around the windows; not too fancy.
A compressor hose was added all the way across the building; from the left side...
...to the mechanical room.
The plumbing vent pipe was finished; it now goes through the roof.
Additional duct work was added to the upstairs bathroom wall.
The grey pipe you see contains wires that will eventually go to the garage when built.
We asked for an outlet to be put in the floor of the Greatroom in case we want lamps or something in the middle of the room.
Wednesday, June 9, 2010
Plumbing and Start of Outside Trim
Things have been extreamly slow the last week, little to none has been done. But, yesterday things started happening. Tony started trimming out the windows, see below, and the plumbing will be complete today.
This is the configuration that we are going to use around the windows. In between the boards will be a plywood that can be exposed to the weather.
This is the tubing that is being used for the water pipes. A nice feature is the red for hot and blue for cold.
Some tubing that is in the first floor ceiling.
The hookup for the tub and shower.
Hookup for the washer.
Ice maker hookup, this is important because my wife is a iced tea addict.
This is the configuration that we are going to use around the windows. In between the boards will be a plywood that can be exposed to the weather.
This is the tubing that is being used for the water pipes. A nice feature is the red for hot and blue for cold.
Some tubing that is in the first floor ceiling.
The hookup for the tub and shower.
Hookup for the washer.
Ice maker hookup, this is important because my wife is a iced tea addict.
Thursday, June 3, 2010
Exterior Trim around the Windows
Tony, our carpenter picked up the boards for the trim around the windows on the exterior yesterday. Hopefully, he can start to put that on today.
We were not sure what we were going to do with all that space around the windows, put in clapboards, panels, or what. We decided to put this exterior sheathing and the trim. So there will be a flat area around the windows, if we want to dress it up in the future we can do that but for now this is it.
Sorry the last few posts have not been that exciting but that is how it goes. Most of the work being done is hidden from plain view. I expect the next few weeks things will start taking shape.
Tuesday, June 1, 2010
Waste Plumbing and Upstairs Wiring
I stopped by the house today and the plumber has been busy. He put all the waste pipes in below the first floor. This is the main line that goes to the septic system.
Plumbing for the shower/tub on the first floor.
Inside the tub.
The electrician was also there, these are the wires that are being sent up to the attic waiting for the upstairs to be finished sometime in the future.
Subscribe to:
Posts (Atom)